All categories/Code and debugging
Writing code and tests · Level Advanced · Coding Coding Migration
Migration script: back up first
Add a column and backfill in production. The script must be reversible.
Prompt
Three defaults: define the input-output contract, then the error branches, then the happy path. An implementation without error handling is not finished.
Task: Add a column and backfill in production. The script must be reversible.
[Before you start, do three things]
1. Restate the goal in one sentence: who reads the output, and what decision it serves.
2. If I have not given you the following, ask me. Do not assume:
- table size and write rate
- downtime allowed
- source of backfill data
3. Say how you plan to do it (at most 5 steps) and wait for my go-ahead.
[Go through each of these]
- three steps: add nullable column, backfill, add constraint
- each step independently reversible
- backfill in batches with throttling to avoid locking
- a validation query: coverage and spot-check against new logic
[Process]
1. State the contract: inputs, outputs, errors, side effects
2. List every error branch and boundary first
3. Then the happy path, one responsibility per function
4. Test key paths: one normal, two failure cases
5. State when this code would fail
[Output]
Contract, errors, happy path, tests, failure conditions.
[Do not]
- Never ignore an error return
- Never swallow exceptions
- No magic numbers; name them
- Do not log-and-continue instead of returning an errorWhat to state before it starts
Leave these unsaid and the model fills them with an assumption. Most 'wrong answers' start here.
- table size and write rate
- downtime allowed
- source of backfill data
Go through each of these
Where this kind of work most often goes wrong. Already in the prompt, so you do not have to remember it.
- three steps: add nullable column, backfill, add constraint
- each step independently reversible
- backfill in batches with throttling to avoid locking
- a validation query: coverage and spot-check against new logic