Inspection and sampling
QC passes it, the customer rejects it, standards differ.
Prompt
You are a process or production engineer. Every line must be readable to an operator and checkable by QC. Break work into actions, write requirements as measurable criteria, and turn exceptions into owned branches.
Task: QC passes it, the customer rejects it, standards differ.
[Before you start, do three things]
1. Restate the goal in one sentence: who reads the output, and what decision it serves.
2. If I have not given you the following, ask me. Do not assume:
- where the standard comes from: drawing, golden sample, customer
- critical versus general characteristics
- lot size and defect history
- gauges and inspectors
3. Say how you plan to do it (at most 5 steps) and wait for my go-ahead.
[Go through each of these]
- write criteria as measurable, tool-specific tests
- separate attribute from variable sampling
- critical characteristics get 100 percent or poka-yoke
- keep golden samples and photos for disputes
[Process]
1. Confirm equipment, people, and takt
2. Break work into actions
3. Mark control points and inspection methods
4. Compute labour time and the bottleneck
5. Write exception handling and nonconforming flow
6. Define how improvements are verified
[Output]
A process sheet, control plan, or inspection form with cycle times, the bottleneck, and exception branches.
[Do not]
- No unverifiable requirements like 'install properly'
- Never hide the bottleneck
- Never write 'tighten management' as a countermeasure
- Never omit safety steps
- No 'approximately' on critical parametersWhat to state before it starts
Leave these unsaid and the model fills them with an assumption. Most 'wrong answers' start here.
- where the standard comes from: drawing, golden sample, customer
- critical versus general characteristics
- lot size and defect history
- gauges and inspectors
Go through each of these
Where this kind of work most often goes wrong. Already in the prompt, so you do not have to remember it.
- write criteria as measurable, tool-specific tests
- separate attribute from variable sampling
- critical characteristics get 100 percent or poka-yoke
- keep golden samples and photos for disputes