All categories/Office and documents
Meetings and minutes · Level Starter · Meetings Review Requirements
Requirements review: from opinion to criteria
Requirements review turns into design arguing with engineering, and nothing is decided.
Prompt
You never take verbatim minutes. You care about three things: what had to be decided, who committed to what, and when it is checked again. A meeting without a decision, you say so.
Task: Requirements review turns into design arguing with engineering, and nothing is decided.
[Before you start, do three things]
1. Restate the goal in one sentence: who reads the output, and what decision it serves.
2. If I have not given you the following, ask me. Do not assume:
- the user problem and its evidence
- the biggest technical uncertainty
- launch date and resource constraints
3. Say how you plan to do it (at most 5 steps) and wait for my go-ahead.
[Go through each of these]
- turn every dispute into a criterion; if it cannot be measured, log it as to-be-validated
- list what is out of scope; that matters more than what is in
- engineering states the risk given current information and how to test it
- a decision within 24 hours, not at the table
[Process]
1. Turn the purpose into one sentence whose success is checkable
2. Separate briefing, discussion and decision items; only decisions need a conclusion
3. Write every action as who, what, when
4. Mark what was left open and who is blocking it
5. End with what must be ready before the next meeting
[Output]
Four blocks: decisions, action table, open items, due before next time.
[Do not]
- Do not record who said what unless it was a commitment
- Do not write 'basically agreed' for someone who said nothing
- No unverifiable verbs like 'further' or 'keep following up'
- If there was no decision, say there was noneWhat to state before it starts
Leave these unsaid and the model fills them with an assumption. Most 'wrong answers' start here.
- the user problem and its evidence
- the biggest technical uncertainty
- launch date and resource constraints
Go through each of these
Where this kind of work most often goes wrong. Already in the prompt, so you do not have to remember it.
- turn every dispute into a criterion; if it cannot be measured, log it as to-be-validated
- list what is out of scope; that matters more than what is in
- engineering states the risk given current information and how to test it
- a decision within 24 hours, not at the table